On site setup checklist

Checklist for checking the health of a system you have recently deployed.

Physical tower checks

  • Tower level and stabiliser legs secure

  • Mast safety pin engaged and lever correctly positioned

  • Winch cable condition verified (no fray, no broken strands, no obvious damage)

  • No cable bunching at mast base

  • Solar panels deployed and locked to correct seasonal angle

  • No panel shading across key daylight hours

  • Brakes applied when unattended

Power checks

  • All batteries connected

  • Battery circuit breakers ON

  • Anderson connectors correctly seated

  • Charger state checked if on mains supply

System checks

  • Live view: confirm all expected cameras are online and framing is correct.

  • Recording: verify each camera is recording.

  • Schedules: confirm team schedule is configured and applied to each system.

  • Battery readings: confirm battery values are visible in system settings.

  • Mains status: confirm mains is detected when connected.

  • Solar or EFOY status: confirm charging values are visible and behavior is expected.

  • Router details: confirm router information is visible.

  • Camera masking: confirm masks are correct for AI detection zones.

  • Audio talkdown: confirm output is enabled and tested.

  • Alarm configuration: confirm alarm levels and power-loss behavior are set.

  • ARC or central station: test send and receive path.

  • Notifications: confirm correct users and health alerts.

  • Walk test: confirm expected alarm and notification behavior.

circle-info

Record any failed checks in site handover notes before leaving location.

Last updated