Safe handling and transport guidance for moving the CCTV Tower on site and by vehicle.
Do not lift with a forklift from restricted sides marked on the tower. Use approved lifting points only.
Ensure mast is fully retracted.
Ensure tower is isolated.
Remove camera head unit if required by transport method.
Attach handle before moving.
Apply brake when tower is unattended.
Take care on slopes.
Use approved pickup side only.
Set solar panel tilt to transport position.
Refit and secure all locking bars and locking nuts.
Use ratchet straps on lifting eyes when securing to a vehicle.
Mast fully down and pinned
Camera secured
Solar locked
No loose cables or loose hardware
Last updated 18 hours ago