Sticker reference

Mapping of current CCTV Tower stickers to their instruction themes and warnings.

This page summarises current on-unit stickers and the key instruction content each one contributes.

1. Main operating instructions

ELECTRICAL BOX LID 250x320mm_Printable

Positioned on front of electrical box lid inside front door.

2. Electrical input safety

ELECTRICAL INPUT 65x65mm_Printable

Positioned on right hand lowest battery tray.

3. Winch safety instructions

Winch Cover Front Graphics Printable

Positioned on front of winch cover.

4. Deployment / pack away instructions

MIDDLE SOLAR PANEL_350x322_Printable

Positioned on rear of middle solar panel.

5. Moving tower instructions

BOTTOM SOLAR ABOVE BRAKE 200X100mm_Printable

Positioned above caster wheel

6. Solar panel angling

SOLAR PANEL ANGLE-110x103_Left_Printable

Positioned either side of solar panel brackets.

7. Mast safety bolt

MAST SAFETY BOLT Ver 2 65x65mm_Printable

Positioned above mast safety bolt

8. Pinch point

PINCH POINT_60x60_Printable

Positioned at various pinch points.

9. Lifting point

LIFTING POINT_60x60_Printable

Positioned near lifting eyes on mast.

Last updated